INSTALLATION

Here at BAT Group Inc, we have 4 different installation systems. System 1 requires battens (2x2 wood), while System 2 has the batten already built into the panel. System 3 features a hidden fastener system that replaces the need for bending or special tools with a simple sliding technique. Our Eco System involved installing the panels ontop of preexisting shingles.

Header-System1

Header-System2

Header-System3

Header-EcoSystem

  • Instagram
  • Facebook